[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

attaching a test process to every trial



Hi,

I'm stuck with an apparently simple problem: I want to test my network 
after each trial. The wizard can do testing after each epoch with the 
cross-validation process, but I've tried it manually and it doesn't 
work. What I do is create a test epoch hierarchy, and then I want to 
link the test epoch into the final procs of the training trial. Can this 
not be done with the GUI?

Thanks,

   -- Gert
-- 

=====================================================================
  Gert Westermann			   gwestermann@brookes.ac.uk
  Department of Psychology, Oxford Brookes University, Oxford OX3 0BP
  Tel +44 (0)1865 48 37 72                  Fax: +44 (0)1865 48 38 87
=====================================================================